Our upstairs office premises have been upgraded by putting on laminated wooden flooring.
Now the premises looks better and clean.
Friday, April 20, 2018
Wednesday, April 18, 2018
MOBILE NIGHT VISION WEBCAM REPOSITIONED TO MONITOR RAINWATER GUTTER
We repositioned our movable night vision webcam this afternoon.
By doing so, our "eye" will allow us to see the effectiveness of our rainwater gutter.
By doing so, our "eye" will allow us to see the effectiveness of our rainwater gutter.
New position of webcam to monitor rainwater gutter |
LAMINATED WOODEN FLOORING FOR UPSTAIRS MEETING SPACE
The upstairs meeting space will be upgraded.
Laminated wooden flooring is to be done these few days.
Once done, the space will look great and events and meetings can be organized.
Laminated wooden flooring is to be done these few days.
Once done, the space will look great and events and meetings can be organized.
Tuesday, April 17, 2018
NEW POSITION FOR MOVABLE NIGHT VISION INTERNET CAMERA
Tomorrow when we do a day trip to MALACCA to oversee the installation of the hinged door and partition in the senior room, we will move the movable night vision camera to the middle of the main hall.
By doing so, we can monitor the gutter of the main airwell, sitting hall and corridor.
Should there be any heavy rain during the day or night, we can monitor the gutter performance from outstation.
By doing so, we can monitor the gutter of the main airwell, sitting hall and corridor.
Should there be any heavy rain during the day or night, we can monitor the gutter performance from outstation.
Monday, April 16, 2018
PARTITION WITH HINGED ALUMINUM DOOR TO BE INSTALLED THIS WEDNESDAY
The final piece of works for the Senior room will be done this Wednesday.
An aluminum hinged door wide enough for wheel chair access and partition is to be installed.
This is the final jigsaw.
An aluminum hinged door wide enough for wheel chair access and partition is to be installed.
This is the final jigsaw.
Monday, April 9, 2018
MINOR REPAIRS NEEDED FOR NEW GUTTER
Today, we did some minor works on the new gutter installed earlier.
After a heavy downpour a week after its installation, rainwater overflowed from the new gutter.
Since the inlet of the old gutter discharges into the new gutter vertically, water was not directed to the new outlets to the right.
This high volume of water just pushed upwards over the new gutter sides.
Now, we put a bend and a short horizontal pipe so that water can be guided to the right outlets.
After a heavy downpour a week after its installation, rainwater overflowed from the new gutter.
This high volume of water just pushed upwards over the new gutter sides.
Now, we put a bend and a short horizontal pipe so that water can be guided to the right outlets.
RELOCATED REAR SENIOR ROOM COMPRESSOR
Trunking for better looks. |
After relocation |
Before relocation. |
The air-conditioning unit cannot be heard inside the senior room anymore.
Friday, April 6, 2018
Subscribe to: