Saturday, August 11, 2018

2 DRAIN COVERS TO COMPLETE CARPARK AREA

We need to put 2 sturdy drain cover at rear inlet into car park area.

Rear carpark drain cover.

FIRST PRIVATE TALK ON FRONT UPSTAIRS OFFICE SPACE

We held the first private talk for invited guests at the upstairs front office space.

The private talk was on retirement.

In the future, we may invite public and private talks by guest speakers on various topics such as on tourism, wild life, ecotourism, health and other topics of public interest.

We hope to make upstairs office space into a meeting point for Malaccans and visitors.

Private talk at front upstairs office space.

Thursday, August 9, 2018

RETRACTABLE ALUMINIUM CLOTH HANGER INSTALLED

We installed a retractable aluminium cloth hanger at the car park area.

With this contraption, wet clothes can be hung and dried.

Retractable aluminium cloth hanger

Wednesday, August 8, 2018

BACKLANE POT HOLES TARRED BY MBMB

It was nice to see the potholes at the back lane of Jalan Kee Ann have been tarred

Finally, the road is much better. Some benefits for paying our annual assessment to Melaka City Council.

Terima kasih.

Potholes tarred up by Melaka City Council

LED LIGHT AND MIRROR WITH SHELF INSTALLED AT HERITAGE ROOM WC

We installed a LED light and a mirror with shelf in the heritage WC yesterday.

LED light and face mirror with shelf


We can now switch on the WC LED light from the inside of the heritage room.



Tuesday, August 7, 2018

UPSTAIRS FRONT ROOM NOW HAS 4FT. LED LIGHT

We fixed a 4ft. LED light in the front upstairs room today.

Light can be switched on front the front door of the room now.

Newly added LED light.


Thursday, August 2, 2018

IMPROVEMENTS TO BE DONE IN MALACCA

Improvements will be done in MALACCA next week.

A 4 ft. LED light will be added in the front room.

Another 2 ft. LED light will be added at the heritage room WC together with a mirror with shelf. This light can be turned on from the heritage room.

Also, the upstairs corridor and upstairs rear WC area maybe installed with motion sensor lights so that the lights will switch on and off if there is motion detected.

Downstairs, a motion sensor light will be put in the carpark WC, ground floor front entrance corridor and a 4ft. retractable Aluminum clothe hanger will also be installed.