MOUNTING CEILING BOARDS IN SENIOR ROOM AND WASHROOM

Before painting of the whole senior room and washroom, we mounted new ceiling boards on the room ceiling.

The purpose of the ceiling boards is to prevent moisture from the shower area to go up the ceiling.

At the same time, it prevents dust to come down into the room from the AV room upstairs.

A fresh coat of paint will also be done.




SHOWER ROOM NEARLY COMPLETED

The shower room is nearing completion.

We need to connect the electrical wiring to the instant water heater.





Wednesday, September 6, 2017

SENIOR WASHROOM IS TAKING SHAPE

Our senior washroom is taking shape.

Tested the washroom with an actual wheelchair.





















Tuesday, September 5, 2017

CLEANING UPSTAIRS WC AND WASHROOM AREAS

Upstairs WC and washroom are being cleaned up. Only slight touch up of wall painting is required.




Monday, September 4, 2017

TILING UP OF SENIOR WC, WASHROOM AND SHOWER AREAS

Our senior WC, washroom and shower areas are being tiled.

Flooring of washroom and senior room areas are to be completed today.

Shower room flooring

Slope in shower floor


Putting in non slip floor tiles for washroom.

Tiled shower area.

Electric instant water heater with pump

Tiled washroom with basin

Non slip floor tiles and WC yet to installed. Hand rails will be installed later.

Saturday, September 2, 2017

SENIOR ROOM WC AND WASH BASIN MOUNTING DIMENSIONS

This photo shows the minimum dimensions for senior room WC and wash basin.






SENIOR ROOM UPGRADING AND WASHROOM

Senior room and washroom are to be completed soon.

Full wall tiling and non slip floor tiles as well.

We may put a frosted glass for skylight in WC area.