Before painting of the whole senior room and washroom, we mounted new ceiling boards on the room ceiling.
The purpose of the ceiling boards is to prevent moisture from the shower area to go up the ceiling.
At the same time, it prevents dust to come down into the room from the AV room upstairs.
A fresh coat of paint will also be done.
Thursday, September 7, 2017
SHOWER ROOM NEARLY COMPLETED
The shower room is nearing completion.
We need to connect the electrical wiring to the instant water heater.
We need to connect the electrical wiring to the instant water heater.
Wednesday, September 6, 2017
Tuesday, September 5, 2017
Monday, September 4, 2017
TILING UP OF SENIOR WC, WASHROOM AND SHOWER AREAS
Our senior WC, washroom and shower areas are being tiled.
Flooring of washroom and senior room areas are to be completed today.
Flooring of washroom and senior room areas are to be completed today.
![]() |
| Shower room flooring |
![]() |
| Slope in shower floor |
![]() |
| Putting in non slip floor tiles for washroom. |
![]() |
| Tiled shower area. |
![]() |
| Electric instant water heater with pump |
![]() |
| Tiled washroom with basin |
![]() |
| Non slip floor tiles and WC yet to installed. Hand rails will be installed later. |
Saturday, September 2, 2017
SENIOR ROOM UPGRADING AND WASHROOM
Senior room and washroom are to be completed soon.
Full wall tiling and non slip floor tiles as well.
We may put a frosted glass for skylight in WC area.
Full wall tiling and non slip floor tiles as well.
We may put a frosted glass for skylight in WC area.