Wednesday, August 23, 2017

UPSTAIRS WC AND SHOWER FLOORS TILED UP

The floors of the upstairs WC and shower area have been tiled up today.



The WC flush tank is to be installed to complete the works. However, we hope to glue on ceramic tiles on the drywall at the left hand side for completeness.
WC Drywall tiled up to the top.




The instant water heater in the shower area will also be re-wired up before the aluminium door reinstalled.