Tuesday, December 12, 2017

GUTTER AT MAIN AIRWELL AND REAR ROOF TO BE DONE FROM 20.12.2017f

FInally, we are getting the gutter above our main airwell and the rear roof old gutter changed to all new galvanised semi round gutter.

Hopefully, our water overflowing  from our gutter main airwell will be thing of the past.

At the same time , we will install a new Panasonic 1 hp split aircond in the senior room. A new single bed of 3' x 6' with mattress will be purchased.

The red cushion bed will be relocated back to parents' room where it was in 1970s. The writing table is to be moved to the red cushion bed was located.

A shelf will be carried up to the upstairs meeting area where it will be used to store some books.

Once done, our final phase of our year long renovation is to rearrange the books into shelves or stored in our storage area.

Monday, December 11, 2017

ANOTHER WAY TO UTILISE WIFI ROUTER FOR SECURITY SURVEILLANCE

We have used the wireless router connected to a webcam for remote surveillance system.

The wireless router provides Internet access while the webcam is pointed at the TV monitor that has 10 CCTV cameras placed at different floors of a Commercial building.



Remote viewing of the premises can be done by smart phones from different places.

Saturday, December 9, 2017

READY FOR DEPLOYMENT IN MELAKA

After setting up the system here similar to the setup in Malacca and testing the connection to the webcam, Internet access and Intranet digital library, it is now ready for deployment.




Friday, December 8, 2017

TESTING DIGITAL LIBRARY

We are currently testing our digital library by connecting the wireless router to the intranet/Internet router.

As we have a Public and Private network, we can allow the public to access our digital library content.

Besides our digital library content, children can use our XOs to learn computing, simple programming skills.

The Private network only allows authorised personnel to access the digital library and Internet access via our wireless router.

Tuesday, December 5, 2017

OUR INTRANET/INTERNET MOBILE ROUTER ARRIVES

Our intranet/Internet router has arrived from Hong Kong.

It arrived yesterday but I was out when our postman came to deliver it.

We will collect it this morning.

This router has a USB data stick which allows its content to be accessible via Intranet by typing in the access code.

At least 15 sets of computers and smart phones can use it at any one time.

To test it before deployment.

Sunday, December 3, 2017

SENIOR ROOM GETTING DONE

Our senior room is getting done. The shower is ready.






Saturday, December 2, 2017

RETENTION POND WORKS ACCORDING TO DESIGN

Our retention pond is working to its function.

Storm water came down after the morning downpour, and after sometime, it flows into the retention pond.

In no time, the retention pond is full and water overflows into the open drain cavity.