Tuesday, January 30, 2018

NEW MAIN AIRWELL GUTTER TO BE INSTALLED

A new gutter system is being proposed so that rainwater will not flow down the 40ft. high down pipe.

Once installed, rainwater from the roof will be piped out to the front of the shophouse and discharged into the public drain.

No rainwater will be discharged into the retention pond before being drained out by the open drain to the rear of the premises.

New gutter and new down pipe on the right for draining out rainwater to the front of shophouse.


Friday, January 12, 2018

FRIENDS VISIT AT MALACCA

Some friends visited our Malacca house yesterday.

They had the opportunity to sit on our new sitting set at the main hall.



NEW SITTING FURNITURE AT MAIN HALL

A new set of sitting furniture has been purchased and delivered in Malacca today.

It consists of a 3 seater and 2 single chairs.

A coffee and side table are also included plus cushions.


New furniture at main hall

Wednesday, January 10, 2018

FULL HOUSE @ HOMESTAYATKEEANNROAD FOR PRE-CNY

This morning we received a request from our relatives to stay at our premises. Our relatives are coming in from Ipoh, Australia and USA.

All the rooms upstairs except the heritage room and downstairs rooms have been taken.

They are expected to come into Malacca on 12.2.2018.

They are expected to stay until 14 or 15.2.2018.

Monday, January 8, 2018

SENIOR ROOM BED RELOCATED

We have relocated the single bed in the senior room today.

The bed is slightly wider by 4 inches which is bearable.



Another position of single bed and table is shown here.

Sunday, December 31, 2017

HAPPY NEW YEAR 2018

2018 has arrived and 2017 has gone forever.

Hopefully, 2018 will be a year of peace, forward looking and stability for everyone.

Coming soon is The Year of the Dog.

Good health, prosperity and good tidings.

Friday, December 22, 2017

MAJOR RENOVATION WORKS IN MALACCA COMPLETED

Finally on 20th. December 2017, our Malacca renovation works have been completed.

It has practically took us 9 months to complete this project. Originally, it was supposed to be completed in 2 months.

The main contractor was unable to meet his dateline and the main air well gutter job was not correctly mounted.

Water flowed down the air well gutter until we have to buy a plastic sheeting to prevent water seepage.

We then organise our own Malacca gutter workers to change the gutters.

With at least 4 workers and their boss around, the job was completed in 1 day.

We also installed a new Panasonic 1 HP split aircond in the senior room as well.

A single metal bed, mattress and 2 single mattresses were bought for parents single beds.

Now, the room is livable and ready for occupancy.