MAJOR RENOVATION WORKS IN MALACCA COMPLETED
Finally on 20th. December 2017, our Malacca renovation works have been completed.
It has practically took us 9 months to complete this project. Originally, it was supposed to be completed in 2 months.
The main contractor was unable to meet his dateline and the main air well gutter job was not correctly mounted.
Water flowed down the air well gutter until we have to buy a plastic sheeting to prevent water seepage.
We then organise our own Malacca gutter workers to change the gutters.
With at least 4 workers and their boss around, the job was completed in 1 day.
We also installed a new Panasonic 1 HP split aircond in the senior room as well.
A single metal bed, mattress and 2 single mattresses were bought for parents single beds.
Now, the room is livable and ready for occupancy.
It has practically took us 9 months to complete this project. Originally, it was supposed to be completed in 2 months.
The main contractor was unable to meet his dateline and the main air well gutter job was not correctly mounted.
Water flowed down the air well gutter until we have to buy a plastic sheeting to prevent water seepage.
We then organise our own Malacca gutter workers to change the gutters.
With at least 4 workers and their boss around, the job was completed in 1 day.
We also installed a new Panasonic 1 HP split aircond in the senior room as well.
A single metal bed, mattress and 2 single mattresses were bought for parents single beds.
Now, the room is livable and ready for occupancy.
Wednesday, December 20, 2017
SENIOR ROOM AIRCOND DONE AND SINGLE BED ADDED
Our senior room is now fully aircond and a single bed with mattress purchased.
Gutter in mid section of roof has also been changed as the original gutter was damaged by workers pulling on it in the center.
Gutter in mid section of roof has also been changed as the original gutter was damaged by workers pulling on it in the center.
Tuesday, December 12, 2017
2018 TO BUY MAIN HALL FURNITURE
After major renovations done in 2017, we hope buy in some classical sitting set of 2 seated chairs, 2 single chairs, coffee table and side table.
Another display cabinet and a low level sideboard (optional) are required.
Hopefully, we can get them in before Chinese New Year on 15th. February 2018.
Another display cabinet and a low level sideboard (optional) are required.
Display cabinet |
Sitting chair with cushion |
Coffee table |
Classical Sideboard |
Hopefully, we can get them in before Chinese New Year on 15th. February 2018.
GUTTER AT MAIN AIRWELL AND REAR ROOF TO BE DONE FROM 20.12.2017f
FInally, we are getting the gutter above our main airwell and the rear roof old gutter changed to all new galvanised semi round gutter.
Hopefully, our water overflowing from our gutter main airwell will be thing of the past.
At the same time , we will install a new Panasonic 1 hp split aircond in the senior room. A new single bed of 3' x 6' with mattress will be purchased.
The red cushion bed will be relocated back to parents' room where it was in 1970s. The writing table is to be moved to the red cushion bed was located.
A shelf will be carried up to the upstairs meeting area where it will be used to store some books.
Once done, our final phase of our year long renovation is to rearrange the books into shelves or stored in our storage area.
Hopefully, our water overflowing from our gutter main airwell will be thing of the past.
At the same time , we will install a new Panasonic 1 hp split aircond in the senior room. A new single bed of 3' x 6' with mattress will be purchased.
The red cushion bed will be relocated back to parents' room where it was in 1970s. The writing table is to be moved to the red cushion bed was located.
A shelf will be carried up to the upstairs meeting area where it will be used to store some books.
Once done, our final phase of our year long renovation is to rearrange the books into shelves or stored in our storage area.
Monday, December 11, 2017
ANOTHER WAY TO UTILISE WIFI ROUTER FOR SECURITY SURVEILLANCE
We have used the wireless router connected to a webcam for remote surveillance system.
The wireless router provides Internet access while the webcam is pointed at the TV monitor that has 10 CCTV cameras placed at different floors of a Commercial building.
Remote viewing of the premises can be done by smart phones from different places.
The wireless router provides Internet access while the webcam is pointed at the TV monitor that has 10 CCTV cameras placed at different floors of a Commercial building.
Remote viewing of the premises can be done by smart phones from different places.
Saturday, December 9, 2017
READY FOR DEPLOYMENT IN MELAKA
After setting up the system here similar to the setup in Malacca and testing the connection to the webcam, Internet access and Intranet digital library, it is now ready for deployment.
Friday, December 8, 2017
TESTING DIGITAL LIBRARY
We are currently testing our digital library by connecting the wireless router to the intranet/Internet router.
As we have a Public and Private network, we can allow the public to access our digital library content.
Besides our digital library content, children can use our XOs to learn computing, simple programming skills.
The Private network only allows authorised personnel to access the digital library and Internet access via our wireless router.
As we have a Public and Private network, we can allow the public to access our digital library content.
Besides our digital library content, children can use our XOs to learn computing, simple programming skills.
The Private network only allows authorised personnel to access the digital library and Internet access via our wireless router.
Tuesday, December 5, 2017
OUR INTRANET/INTERNET MOBILE ROUTER ARRIVES
Our intranet/Internet router has arrived from Hong Kong.
It arrived yesterday but I was out when our postman came to deliver it.
We will collect it this morning.
This router has a USB data stick which allows its content to be accessible via Intranet by typing in the access code.
At least 15 sets of computers and smart phones can use it at any one time.
To test it before deployment.
It arrived yesterday but I was out when our postman came to deliver it.
We will collect it this morning.
This router has a USB data stick which allows its content to be accessible via Intranet by typing in the access code.
At least 15 sets of computers and smart phones can use it at any one time.
To test it before deployment.
Sunday, December 3, 2017
Saturday, December 2, 2017
RETENTION POND WORKS ACCORDING TO DESIGN
Our retention pond is working to its function.
Storm water came down after the morning downpour, and after sometime, it flows into the retention pond.
In no time, the retention pond is full and water overflows into the open drain cavity.
Storm water came down after the morning downpour, and after sometime, it flows into the retention pond.
In no time, the retention pond is full and water overflows into the open drain cavity.
Subscribe to:
Posts (Atom)